Pre-launch · validation cohort now forming

01 · TodayPerilova

Price the climate we are getting, not the one we had.

Perilova downscales climate to the kilometre, simulates flood, wildfire, wind and heat at every insured asset, and turns them into expected loss and tail risk for today and for 2050. Fast enough to use while you underwrite, and while the storm is still moving.

PV-0026 · synthetic coastal portfolio · 142 assets · 150 × 100 kmExample

Peril

Climate

Grid

Assets in high hazard
–
Average annual loss
–
1-in-100 loss
–
1-in-250 loss
–

Top drivers of average annual loss

    Pick a peril, a climate scenario and a grid. The map, the losses and the curve update together.

    Synthetic region and portfolio with toy hazard and damage functions, 1,000 simulated years. Values are illustrative, not Perilova model output.

    02 · 2030Targets

    What we are building toward.

    Design targets, not results. We will publish measured numbers, validated against realised losses, as the validation cohort runs.

    1 km

    hazard resolution at every insured location, instead of 25–100 km cells

    Design target

    Minutes

    to score a portfolio, not an overnight batch

    Design target

    2100

    climate horizon on every exceedance curve, across SSP pathways

    Design target

    Hourly

    loss updates while an event unfolds

    Design target

    03 · 2035Problem

    The models assume a climate that is gone.

    Catastrophe models price risk on historical statistics and coarse grids. Climate change broke the first assumption; asset-level underwriting breaks the second.

    • One number covers a whole city, though the warehouse on the river bank and the office on the hill face very different floods.
    • History is a short record of a changing system; the tail it shows is too thin and drifting.
    • Runs take overnight, so pricing and capital decisions lag the risk.
    • When insurers cannot price a region with confidence, they raise rates sharply or leave, and people go uninsured.

    05 · 2045How it works

    From a list of locations to a defensible number.

    1. 01Day 1

      Upload exposure

      Locations, values, construction and cover, inside your boundary.

    2. 02Hours

      Downscale

      Klyma builds 1 km climate fields for today and each scenario.

    3. 03Hours

      Simulate hazard

      Hazor runs flood, wildfire, wind and heat at every location.

    4. 04Minutes

      Price the loss

      Exura turns hazard into damage, loss and exceedance curves.

    5. 05Same day

      Decide

      Augura explains drivers and drafts terms, limits and reports.

    06 · 2050Resolution

    Why the kilometre matters.

    The same portfolio at 25 km and at 1 km can show different assets at risk. Try the Grid switch in the console above.

    Where the gap is
    Typical catastrophe modelPerilova (design target)
    Grid25–100 km cells1 km, down to the asset
    ClimateHistorical statistics, stable climate assumedToday plus SSP pathways to 2100
    SpeedOvernight batch runsMinutes per portfolio on GPUs (target)
    During an eventWait for the post-event reportLosses updated as the event moves
    Explaining a numberAsk the vendorDrivers per asset, in plain language

    07 · 2060Who it’s for

    For everyone who carries the risk.

    08 · 2070For risk engineers

    Numbers you can trace.

    Every loss links back to the climate field, the hazard layer and the damage curve that produced it.

    • Scores by API, by file drop or in the platform.
    • Versioned models and scenario sets, so last quarter’s run can be reproduced.
    • Outputs in the formats your cat team already uses.
    • On-premises or in your cloud for sensitive books.
    See the platform and integrations
    score_portfolio.pyExample
    # score a portfolio for today and two scenarios
    from perilova import Client
    
    pv = Client(region="eu-west")
    run = pv.exura.score(
        exposure="s3://book/2026q4/locations.parquet",
        perils=["flood", "wind"],
        scenarios=["today", "ssp245-2050", "ssp585-2050"],
        resolution_km=1,
        members=200,           # ensemble size
    )
    run.ep_curve("ssp585-2050").loss_at(rp=100)
    run.drivers(asset_id="WH-0381")   # why this asset scores high

    09 · 2080Questions

    Plain answers.

    Is Perilova available today?

    No. Perilova is pre-launch. We are forming a validation cohort of insurers, reinsurers and public agencies to score real books with us and test the models against realised losses.

    Do you replace our catastrophe model vendor?

    Not on day one. Most teams start by running Perilova alongside their current model on one peril and one region, then compare.

    How do you know the 2050 numbers are right?

    Nobody can verify 2050 today. We validate the hazard and damage models against realised events now, state the scenario assumptions plainly, and show the uncertainty band on every number.

    Where does our exposure data go?

    Nowhere you do not choose. We plan on-premises and private-cloud deployments so locations and values stay inside your boundary.

    Are the numbers on this site real?

    No. They are design targets or illustrations, and each is labelled. The console uses a synthetic region and toy models.

    10 · 2100Next step

    Send us a portfolio. We will show you what moves by 2050.

    Share a sample of locations, or let us use a synthetic one. We score it at asset level for today and two climate scenarios, show the exceedance curves side by side, and walk you through the drivers.